9780130859112-0130859117-Commissioning Buildings in Hot Humid Climates: Designs and Construction Guidelines

Commissioning Buildings in Hot Humid Climates: Designs and Construction Guidelines

ISBN-13: 9780130859112
ISBN-10: 0130859117
Edition: 1
Author: Fairmont Press, David David Odom, George Dubose, J. David Odom
Publication date: 1999
Publisher: Prentice Hall PTR
Format: Hardcover 90 pages
FREE US shipping

Book details

ISBN-13: 9780130859112
ISBN-10: 0130859117
Edition: 1
Author: Fairmont Press, David David Odom, George Dubose, J. David Odom
Publication date: 1999
Publisher: Prentice Hall PTR
Format: Hardcover 90 pages

Summary

Commissioning Buildings in Hot Humid Climates: Designs and Construction Guidelines (ISBN-13: 9780130859112 and ISBN-10: 0130859117), written by authors Fairmont Press, David David Odom, George Dubose, J. David Odom, was published by Prentice Hall PTR in 1999. With an overall rating of 4.1 stars, it's a notable title among other books. You can easily purchase or rent Commissioning Buildings in Hot Humid Climates: Designs and Construction Guidelines (Hardcover) from BooksRun, along with many other new and used books and textbooks. And, if you're looking to sell your copy, our current buyback offer is $0.3.

Description

Learn proactive strategies to prevent potentially costly and dangerous building IAQ problems associated with hot, humid climatic conditions. Prepared in cooperation with Disney Development Company, this book deals exclusively with aspects of the design, construction or operation of buildings for which even relatively minor errors can have devastating results when the building is located in a hot, humid climate. Disney's consistent adherence to the principles outlined in this manual has dramatically reduced problems in its new construction. The information presented combines the experience of CH2M Hill, the largest environmental engineering firm in the U.S., and Disney, one of the premier facility planning and management firms in the world. Key issues covered include indoor air quality problem factors; hot humid climate considerations; new building failure; and a model for future success. Specifically addressed are schematic design, design development, final design, construction, and post-construction startup and system commissioning. The concepts and approaches presented are those which have proven successful in designing and operating problem-free indoor building environments in hot and humid locations.

Rate this book Rate this book

We would LOVE it if you could help us and other readers by reviewing the book